The Titan
Model Name: The Titan
Type: Industrial / Operations Hub / Logistics Facility
Description:
A multi-container industrial complex designed for large-scale workshops, logistics hubs, plant operations, and mobile industrial facilities. Titan combines expansive open areas, reinforced structural design, and heavy-duty electrical capacity to support demanding operational environments while remaining modular and transportable.
Starting At:
R395,000 – R585,000
(Estimated starter range depending on container count, span size, and electrical configuration)
Container Dimensions:
Dual, Triple, or Quad Container Layout
Approx. 50 m² – 120 m² operational space
Expandable modular footprint
Starting At: R395,000
A large-scale modular industrial facility — expandable, durable, and engineered for serious operations
Details
Layout:
-
Large open-span industrial workspace
-
Multiple roller shutter equipment bays
-
Dedicated office / operations control room
-
Storage & logistics preparation zone
-
Staff kitchenette & rest area
-
Full staff bathroom facilities
-
Optional mezzanine storage platform
Materials:
-
Refurbished CSC-certified steel container shells
-
Reinforced steel structural framing
-
Industrial-grade flooring & reinforced base
-
Heavy-duty industrial roller shutter doors
-
Large-format aluminium windows for office areas
-
Weatherproof & corrosion-resistant coatings
-
Structural roof reinforcement for equipment loads
Power & Utilities:
-
High-capacity electrical distribution system
-
Three-phase industrial power ready
-
Equipment-specific power circuits
-
LED industrial lighting design
-
Generator integration or hybrid solar systems
-
Full plumbing for staff facilities
-
HVAC or industrial ventilation options
-
Data & network infrastructure for operations
Optional Add-Ons:
-
Climate-controlled office module
-
Integrated generator housing
-
Tool & equipment storage systems
-
Forklift-accessible door upgrades
-
Security fencing & perimeter lighting
-
Industrial automation / monitoring systems
-
External loading deck or ramp system
-
Acoustic & heat-resistant internal panels
Build Time:
8 – 14 weeks
Warranty:
-
1 Year structural
-
6 Months fittings & fixtures